Power Failure on 12 Mar 2026 05:11:00 (UTC+00:00)
Resolved on 18 Mar 2026 13:40:58 (UTC+00:00)
Update: Homelab Power Outage
Status: Power Stabilized

Utility power in the area has now stabilized after earlier outages and surging conditions. Systems remained powered off during the instability to prevent potential hardware damage.

Infrastructure will now begin a controlled power-up and recovery process to safely restore services hosted within the homelab environment.

Incident Start: March 12, 2026 — ~1:04 AM EST
Cause: Area power outage and electrical instability
Current Status: Power stable, systems beginning recovery
Impact: Some services may remain temporarily unavailable while systems are brought back online

Additional updates will be provided as services are restored.
Update on 12 Mar 2026 09:26:24 (UTC+00:00)
Update: Homelab Power Outage
Status: Utility Power Unstable

Utility power in the area is currently unstable and experiencing repeated surges. Due to the unstable electrical conditions, all homelab systems will remain fully powered off and disconnected to prevent potential hardware damage.

The electrical utility has updated the estimated restoration time to approximately 7:30 AM EST. Systems will remain offline until stable power is confirmed.

Once power has stabilized, infrastructure will be brought back online in a controlled manner to ensure safe startup of all systems.

Incident Start: March 12, 2026 — ~1:04 AM EST
Current Status: Power instability / surging
Estimated Power Restoration: ~7:30 AM EST
Impact: All homelab-hosted services remain unavailable

Further updates will be provided once stable power has been restored.
Investigating on 12 Mar 2026 05:11:00 (UTC+00:00)
Incident: Homelab Power Outage
Status: Investigating

All homelab services are currently offline due to a power failure that occurred at approximately 1:04 AM EST. This outage affects all systems hosted within the homelab environment.

Services will remain unavailable until power is restored and systems can be safely brought back online. Once power is restored, recovery procedures will begin and services will be brought back online as quickly as possible.

Start Time: March 12, 2026 — ~1:04 AM EST
Cause: Power failure
Impact: All homelab-hosted services unavailable

Further updates will be provided as progress is made toward restoration.

As of right now both NA-PA-01 AND NA-PA-02 are unplugged and offline to hopefully keep the power from surging.